Operational before grid connection! Temporary power solutions for data centers.
Construction of a 'No Waiting' Data Center! Next-generation temporary power solutions to fill the gap while waiting for grid connection.
The rapid expansion of AI demand has led to an increasing number of cases where there are several years of waiting time for grid connections to data centers. Aggreko's "Bridging Power Solutions" is a modular temporary power generation service that fills this gap. In addition to diesel, gas, and battery energy storage systems (BESS), we provide a one-stop solution up to substation equipment, enabling operation in as little as a few months. This allows for flexible power operation that adapts to demand fluctuations while avoiding construction and operational delays. After grid connection, the rental model allows for quick removal, enabling efficient power investment in line with data center growth strategies. Based on our proven track record in over 100 countries worldwide, we have established a system that can be safely implemented in the Japanese market. **Features** - Can be constructed in as little as a few months: Modular power plants provide the necessary scale (from a few MW to several tens of MW) quickly. - Flexible configuration: We design the optimal plant by combining diesel, gas, BESS, and substation equipment. - Minimizes initial investment with a rental model: No need to purchase equipment. Quick removal is possible after grid connection. *We are currently offering free explanatory materials with case studies! Please check from the catalog download.*
- Company:Aggreko Japan
- Price:Other